You are here: Home > Integrative Training > FFC > Top Mount

Manufacturing Procedures - Top Mount

 

Students are required to cut the surfaces according to the drawing and two 10mm diameter holes are also need to drill.

Manufacturing procedures of this component is quite simple to clamp in a machine vice installed in a vertical milling machine and cut by using the end mill cutter and to drill the holes.