Integrative Training Project - Mechanical Toy
General Knowledge
Material List
Photos Gallery
Timetable -- 2007/2008 ISE TopUp Dg2
Videos for Gear Manufacturing -- Gear Hobbing -- Bevel Gear Milling
Videos for Assembly -- Crank Box Assembly -- Gear Box Assembly -- Monster Head and Tail Assembly -- Monster Toy Assembly -- Final Assembly
-- Completed Product
Updated Drawing
Manufacturing Procedure of Components
Notes: The cells with blue color is meant that this component must be finished before NCM workshop which refers to the timetable. All the other components must be finished before the assembly day.
Minor Jobs
- Report Form (PDF version) - Report Form (Word Document)