Cost
Analysis in real situation
|
No. |
Parts |
Cost |
|
1 |
Material |
HK$800.00 |
|
2 |
Handle |
HK$300.00 |
|
3 |
Motor |
HK$500.00 |
|
4 |
Speed
Control |
HK$800.00 |
|
5 |
Emergency
Stop |
HK$135.00 |
|
6 |
Box |
HK$96.00 |
|
7 |
M-belt |
HK$6.00 |
|
8 |
Ball
Screw & Nut |
HK$2400.00 |
|
9 |
Screw |
HK$51.00 |
|
10 |
Bearing |
HK$440.00 |
|
|
Total: |
HK$5528.00
|
Labour Cost
Cost
of technical labour in Mainland China per month: $800
Duration for manufacturing the product: 1 month
No. of technical labour: 6
=
$800 * 1 * 6 = HK$4800.00
Cost
of design engineer: $12000
Duration for designing the whole framework: half month
No. of design engineer: 1
= $12000 * 0.5 * 1 = HK$6000.00
|
Development Cost |
|
Material
Cost
|
HK$5528.00 |
|
Labour Cost |
HK$4800.00 |
|
Design Cost |
HK$6000.00 |
|
Total: |
HK$16328.00
|